WebFloatover installation methods offer savings relative to heavy lift vessels, and once the platform is in position, fast and secure riser pull-in is needed so production can begin. Play video The final stage, the topside loadout Building transport into the … WebApr 1, 2008 · The basic concept in the float over is to transport the topsides on a vessel in one piece, position the vessel over the substructure, and lower the topsides onto the substructure while maintaining the position of …
floatover installation SPE
WebDec 22, 2008 · Installing a large deck onto a platform, such as a spar, using the floatover method is gaining popularity. This is because the operational cost is much lower than other methods of installation, such as modular lifts or a single piece installation by a … WebMay 5, 2008 · In 2006, the first floatover deck was installed on a Spar platform: the Kikeh Spar. This installation was performed in 1320 m water depths in the South China Sea, offshore East Malaysia. The deck weight was 4000 mt and the swell at the time of installation was Hs of 0.7m at periods of 7 - 8 seconds. fnf weeks of nightmare
Experimental investigation on twin-barge floatover …
WebJan 1, 2024 · 2.Project Phases Installation of CPP Topside using Floatover method on CPP Jacket Load out of CPP Topside on S45 Transportation of CPP Topside Sailaway Location: S45 mobilize to Topside Fabrication Yard Location: Block B of Natuna Sea – Indonesia The NBCPP is located in 95.2 m water depth. 3. WebFeb 15, 2024 · As shown in Fig. 1, the typical process of a floatover installation in field waters includes the following five phases: a. Docking: Once the preparatory works are completed, the DTV will be maneuvered inside the legs of jacket and finally stop at the designed position in the jacket, as shown in Fig. 2. WebTrelleborg's engineered products division has been awarded a contract by the Siemens/Petrofac consortium for its first floatover installation of an offshore co 掌桥科研 一站式科研服务平台 fnf week background